Charles Taylor
Building Envelope Engineering

Full Report

Windemere at Ponte Vedra Beach Condominium Association · Inspection May 14, 2026

Section 1: Cover & Report Metadata

PropertyWindemere at Ponte Vedra Beach Condominium Association
Buildings CoveredBuildings One and Two
Address900 Spinnakers Reach Drive
Ponte Vedra, FL 32082
St. Johns County, Florida
Inspection DateMay 14, 2026 (in-person field inspection)
Inspection TypePre-Hurricane Season Bi-Annual Condition Assessment
Report NumberRCA-20260514-001
Report IssuedMay 15, 2026
Prepared byCharles Taylor
Kristophor C. Linster, P.E., RRC, CBECxP, LEED AP BD+C, CDT, RRO, CEI, Principal Engineer
kcl@cts-engco.com
Prepared forWindemere at Ponte Vedra Beach Condominium Association · c/o Marsh Landing Management Company
Engineer of RecordCharles Taylor (2025 modified bitumen reroof, design and construction administration)

Section 2: Executive Summary

Charles Taylor performed an in-person bi-annual roof condition assessment of Windemere at Ponte Vedra Beach Condominium Association on May 14, 2026. The inspection covered Buildings One and Two at 900 Spinnakers Reach Drive, Ponte Vedra, FL 32082. The inspection occurred within the pre-hurricane-season window recommended for Northeast Florida coastal properties and serves as the dated photographic baseline of record for the 2026 storm season.

Two Roof Systems, Reported Separately

Installed 2025

Modified Bitumen Roof, Areas B1-MB and B2-MB

GOOD
24 to 28 years remaining service life
Existing System

Concrete Tile Mansard, Areas B1-TM and B2-TM

FAIR
10 to 12 years remaining service life

Plus Area B1-CH (Building 1 chimney chases): new aluminum louvered caps installed under the 2025 scope per drawing A701. Internal spark arrestors above the flues are unit-owner-controlled. See the Owner-Controlled Items section.

0
S1 Critical
3
S2 Major
5
S3 Moderate
1
S4 Monitor

Section 3: Property and Roof System Description

Windemere at Ponte Vedra Beach Condominium Association is a multi-building oceanfront luxury condominium community within the Marsh Landing community in St. Johns County, Florida. The property's east-facing roof edges sit at the immediate Atlantic Ocean shoreline within ASCE 7-22 Exposure D and within 500 feet of the shoreline (ISO 9223 Class C5 corrosion environment).

Engineer of Record History

Charles Taylor served as Engineer of Record for the design and construction administration of the 2025 modified bitumen roof replacement covering Areas B1-MB and B2-MB on Buildings One and Two. The original Built-Up Roofing (BUR) system was removed and replaced with a multi-ply modified bitumen assembly over specified insulation on the existing concrete roof deck. The existing concrete tile mansard (B1-TM and B2-TM) was not part of that scope and pre-dates the 2025 reroof. The Building 1 chimney chases (B1-CH) received new aluminum caps under the 2025 scope per drawing A701, but the internal spark arrestors above the flues remain unit-owner-controlled.

Roof Areas

Area CodeBuildingSystemDescription
B1-MBBuilding 1Modified Bitumen RoofCentral low-slope membrane roof on Building 1. Installed 2025 replacing original BUR per drawings dated May 9, 2024. Multi-ply modified bitumen over specified insulation on existing concrete deck. Charles Taylor served as Engineer of Record.
B1-TMBuilding 1Concrete Tile MansardExisting concrete flat tile mansard slopes flanking the central low-slope area on Building 1. Pre-dates the 2025 reroof scope. Estimated 10 to 12 years of remaining service life.
B1-CHBuilding 1Chimney ChasesStucco-clad chimney chases with new aluminum chimney caps installed under the 2025 scope per drawing A701. Internal chimney spark arrestors above the flues are unit-owner-controlled (not common element).
B2-MBBuilding 2Modified Bitumen RoofCentral low-slope membrane roof on Building 2. Installed 2025 replacing original BUR per drawings dated May 9, 2024. Multi-ply modified bitumen over specified insulation on existing concrete deck. Charles Taylor served as Engineer of Record.
B2-TMBuilding 2Concrete Tile MansardExisting concrete flat tile mansard slopes flanking the central low-slope area on Building 2. Pre-dates the 2025 reroof scope. Estimated 10 to 12 years of remaining service life.

Construction Drawings of Record

See the Drawings page for Windemere Condominiums Roof Replacement (Buildings One and Two) dated May 9, 2024.

Section 4: Site & Code Context

ItemValue
JurisdictionSt. Johns County, Florida (Building Division)
Florida Building CodeFBC 2023 (8th Edition); FBC-EB Section 706 reroof triggers
HVHZ StatusNOT in HVHZ (applies only to Miami-Dade and Broward Counties)
Wind LoadingASCE 7-22; Risk Category II; Vult approximately 140 mph; Exposure D
Wind-Borne Debris RegionYes (St. Johns County)
Secondary Water ResistanceRequired per FBC 2023 Section 1503; confirmed present on 2025 mod-bit installation
FS 553.899 (SB 4-D)Milestone inspection at 25 years (coastal); SIRS every 10 years
OIR-B1-1802 (Rev. 04/26)Updated wind mitigation form effective April 1, 2026
Corrosion ClassISO 9223 Class C5 (within 500 ft of shoreline)

Section 5: Inspection Methodology

Kristophor C. Linster, P.E., conducted an in-person bi-annual roof condition inspection on May 14, 2026. The inspection covered the modified bitumen roof fields (Areas B1-MB and B2-MB), the perimeter screen-wall assemblies, the internal drains and through-wall scuppers, the rooftop equipment, the Building 1 chimney chase enclosures (Area B1-CH), and visible portions of the concrete tile mansard slopes (Areas B1-TM and B2-TM) on Buildings One and Two. Sixty-seven (67) photographs were captured during the inspection and form the documentary record of this report.

Scope and Method

This was a visual condition assessment performed from accessible roof surfaces. No destructive testing, no infrared moisture survey, and no uplift testing were performed as part of this bi-annual cycle. Findings are based on direct visual observation supported by the photographic record. The engineer of record continuity for the 2025 modified bitumen system informs the interpretation of the membrane field condition.

Severity Rubric

TierDefinitionAction Window
S1 Critical / EmergencyActive leak, structural risk, or immediate failure potential0-30 days
S2 MajorSignificant condition; will worsen rapidly without action30-90 days
S3 ModerateActive condition; address before next bi-annual cycle90 days - 1 year
S4 MonitorWithin normal envelope; monitor at next inspectionNext inspection

Section 6: Findings Register

See the detailed Findings page for all 9 findings with photographs.

Section 7: Photo Log

See the Photos page for the complete 67-photo gallery.

Section 8: Recommendations and Action Plan

Modified Bitumen Roof (2025): Maintenance Items

Complete before June 1, 2026. Combined scope under $10,000 pending contractor pricing.

Concrete Tile Mansard (Existing): Repair Items

Address within 30 to 120 days. Combined scope $10,000 to $30,000 pending contractor pricing.

Capital Planning

Begin capital planning for full tile mansard replacement within the next 5 to 7 years to align with the estimated 10 to 12 year remaining service life. The modified bitumen roof installed in 2025 does not require capital planning at this time.

Section 9: Owner-Controlled Components

Owner-Controlled Item: Chimney Spark Arrestor Condition (Area B1-CH)

Inspection of the Building 1 chimney chase enclosures (Area B1-CH) documented severe corrosion of the ferrous chimney spark arrestors located above the chimney flues within the new aluminum chimney caps installed under the 2025 reroof scope (per drawing A701). These spark arrestors are unit-owner-controlled components and are not common-element property of the Association. Because they are not common-element, they could not be replaced as part of the 2025 common-element roof replacement scope. Building 2 does not have chimneys.

The Association should formally notify the affected Building 1 unit owners of the spark arrestor condition so that owners may arrange replacement with their own chimney-sweep or fireplace-service contractor. Recommended replacement specification is 316 stainless steel spark arrestor with appropriate bird and animal screen, sized to the existing flue diameter and code-compliant per NFPA 211. Replacement is recommended before the next heating-season use of the fireplaces.

Section 10: Service Life and Capital Forecast

Roof SystemAreaRemaining LifePosture
Modified Bitumen (installed 2025)B1-MB, B2-MB24 to 28 yearsGOOD Maintenance-tier items only.
Concrete Tile Mansard (existing)B1-TM, B2-TM10 to 12 yearsFAIR Begin capital planning for replacement in 5 to 7 years.
Chimney chase enclosures (Building 1)B1-CHLong-term (caps installed 2025)Routine sealant refresh. Spark arrestors are owner-controlled.

Section 11: Limitations and Scope

This bi-annual roof condition assessment was performed as a visual inspection from accessible roof surfaces on May 14, 2026. The scope of this inspection did not include destructive testing, core cuts, infrared moisture surveys, or wind uplift testing. The findings reflect conditions observed on the date of inspection. Subsequent storm events, mechanical damage, or other intervening events may alter conditions; observations from this report should not be relied upon as a representation of conditions at any future date.

Components identified as owner-controlled or as falling outside the Association's common-element responsibility are described for the Association's information and are not within the corrective-action scope of this report.

Cost-range estimates in this report are conceptual and are intended for budget orientation only; qualified contractor pricing should be obtained before authorizing any scope of work.